Vertical tank-1000 m3 repair.

Vertical tank 1000 m3 repair works are carried out.

Replacement of two upper flanges of wall and roof is carried out. Mounting of two flanges of the walls is completed, fins welding is carried out. Roof with maintenance platforms has been erected.